ForgotPassword?
Sign Up
Search this Topic:
Forum Jump
Posts: 2728
Member Since: 07/23/10
01/07/14 03:13 PM
I can say right now that F-SOG will want a flight of six. Two with the appropriate miniaturized components, and four stripped. These are for GJ operations.
Share This